On November 29, students attended a reception and preview of the new Vernon Social Center, scheduled to open in Fall of 2013. Tentative plans include new study and recreation spaces, a specialty sandwich shop, a convenience store, a bar, and other amenities, to be shaped with student input from the reception.
This is box left header
All you need to do is to visit your Custom Homepage Images tab and upload new images (you can crop them after uploading) and enter text and links to replace this text.
This is box center header
All you need to do is to visit your Custom Homepage Images tab and upload new images (you can crop them after uploading) and enter text and links to replace this text.
This is box right header
All you need to do is to visit your Custom Homepage Images tab and upload new images (you can crop them after uploading) and enter text and links to replace this text.